HLA Engineering and Land Surveying, Inc. - Harrah Road Sidewalk Improvements

Harrah Road Sidewalk Improvements

Branch Road to Harrah Grade School

This much-needed project improved the safety of vehicles, school busses, pedestrians (school children), and bicyclists.  Construction was completed during the summer of 2016 and included 1,100 feet of new 8-foot cement concrete sidewalk, widening of the existing roadway to allow for parallel parking, curb and gutter, curb ramps, storm drainage improvements (including catch basins, pretreatment manholes, and infiltration trenches), utility adjustments, and other related work.  A portion of the work crossed railroad facilities which required coordination with Central Washington Railroad Company.  HLA provided the funding application assistance, topographic survey, design, plans and specifications, services during construction, and funding administration.

Sources of Project Funding

  • TIB, STP, and
  • Local Funds

Total Project Cost: $368,000

Click on the photos below for a larger view.



« Back

©2017 HLA Engineering and Land Surveying, Inc. • All Rights Reserved.