HLA Engineering and Land Surveying, Inc. - Prosser 7th Street Reconstruction

Prosser 7th Street Reconstruction

Wine Country Road to Mead Avenue

This key north-south arterial directly accesses the central business district in Prosser from Wine Country Road, passing in front of City Hall.  The 3-block section of roadway was in very poor condition, including two sets of abandoned railroad track crossings and intermittent pedestrian facilities. 

With HLA’s assistance and early application to the 2015 Urban Arterial Program, the City of Prosser was granted funds for this critically important project for the community.  Work included angle parking on both sides of the street, replacement of sporadic sections of existing deteriorated sidewalks, curb and gutter, new gravel base, asphalt, storm drainage, LED illumination, and pavement markings.

HLA services included funding application assistance, design engineering, plans, specifications, bidding assistance, construction observation and management, and funding administration services. 

Sources of Project Funding:

  • TIB
  • Local Funds

Total Project Cost: $1,504,000