This project featured the installation of over 14,000 linear feet of new 15-, 18-, 21-, and 24-inch diameter gravity sewer main from Moxee’s Wastewater Treatment Plant to the Terrace Heights Sewer District Lift Station. A new metering/monitoring station was constructed to measure and sample sewage flows from the City of Moxee.
We provided complete planning, design, engineering, plans, specifications, estimates, and construction administration for this PWTF and SIED funded project. Multi-agency cooperation was a necessity for the regionalization of wastewater treatment.
Total Project Cost: $2,918,000
Click on the photos below for a larger view.