HLA Engineering and Land Surveying, Inc. - Project Details

North Prosser Reservoir Zone 2 Improvements

City of Prosser

The North Prosser Zone 2 Improvement project included construction of a new 1.2 million gallon welded steel reservoir (120 feet tall, 42 feet in diameter), 4,000 GPM Booster Pump Station, and 5,000 linear feet of 12-inch and 16-inch transmission main.  The extreme hard rock conditions made the project unique.  Language on the plans and in the contract specifications were written specifically to protect the owner from change orders related to hard rock excavation.  The project provides additional flow capacity and increased service pressures to meet current and future system demands and fire flow requirements of the North Prosser area.  HLA provided design, construction inspection, and startup coordination services for this important water improvement project.

Sources of Project Funding

  • USDA Loan
  • Local Funds

Total Project Cost:  $1,600,000

Click on the photos below for a larger view.



« Back

©2017 HLA Engineering and Land Surveying, Inc. • All Rights Reserved.