Pressure Zone 5.5 Improvements - Selah

City of Selah

The Pressure Zone 5.5 Improvements Project, constructed from 2004 through 2006, extended the City water system from the existing Zone 3 Brader Hill Reservoir to Lookout Point.  The project featured the construction of a new 1.2 million-gallow Zone 5.5 Lookout Point Reservoir, a 1,000 GPM duplex booster pump station, and 18,000 linear feet of new transmission main.

Sources of Project Funding

  • PWTF
  • DWSRF Loan

Total Project Cost:  $2,238,000