Harrah Wastewater Treatment Plant Improvements

Harrah’s Wastewater Treatment Plant was not meeting effluent ammonia limits required by its wastewater discharge permit because of the type of treatment provided.  Other issues were failure of the main sewage lift station, unreliable clary liners in the lagoons, and problems with the chlorine disinfection process.  With HLA’s assistance, early planning, rate increases for users, and information gathered from IACC conferences, the Town successfully assembled a financial package for this ‟IACC Award Winning Wastewater Treatment Plant Improvement project.”  Improvements included pumps and controls at the main lift station, headworks screening equipment, replacement of the lagoon liners and aeration equipment in two lagoon cells, construction of two SAGR aerated rock filters, a new aeration and UV disinfection building, repurposed UV disinfection equipment, new electrical system and controls (including an emergency generator), and lab and operations building upgrades.

HLA services included funding acquisition assistance, field investigations necessary for design, topographic survey, design plans, specifications, estimates, bidding assistance, and construction observation and administration. 

Sources of Project Funding:

  • Community Development Block Grant
  • USDA
  • Local Funds

Total Project Cost: $3,500,000

Click on the photos below for a larger view.



« Back

©2019 HLA Engineering and Land Surveying, Inc. • All Rights Reserved.